A new methane Transfer Tube, used for moving liquid methane to the Raptor engines on a Super Heavy Booster or Starship, was delivered to the Production Site. Meanwhile, a Nosecone and Barrel Section sporting Thermal Protection Tile blankets and attachment points were moved near Tent 3.

Video & Photos from Mary (@BocaChicaGal) and the NSF Robotic Camera Team. Edited by Derek “DK” Knabenbauer (@DKlarations).

All content copyright to NSF. Not to be used elsewhere without explicit permission from NSF.

Click "Join" for access to early fast turnaround clips, exclusive discord access with the NSF team, etc - to support the channel.

Rolling Updates and Discussion: https://forum.nasaspaceflight.com/index.php?board=72.0

Articles: https://www.nasaspaceflight.com/?s=Starship

NSF Store: https://shop.nasaspaceflight.com/

L2 Boca Chica (more clips and photos) from BC's very early days to today.
https://forum.nasaspaceflight.com/index.php?topic=47107.0
(Join L2 and support NSF here: https://www.nasaspaceflight.com/l2/)

0:00 Sunrise
0:21 Booster 4 Stacking in the High Bay
1:15 GSE 3 Tank Work
1:34 Methane Transfer Tube
2:09 Work inside GSE 3 Tank
2:34 Scrapping test Nosecone / This nosecone was used in the cargo bay pathfinder*
3:03 Starship Transport Stand
3:36 Two Mystery Structures
4:30 Gray Mystery Structure
4:57 Equipment for the Orbital Launch Table
5:19 Work on the Orbital Launch Table Continues
5:51 Rolls of Stainless Steel Delivered to the Propellant Production Site
6:17 Work on the Orbital Launch Mount Continues
6:46 Work on GSE 1 & 2 Tanks
7:38 Close Up of GSE Stringers
8:44 Roadwork Outside the Launch Site
9:35 Work on the 9th Tower Section
10:00 Equipment Lifted into the 9th Tower Section
11:05 Brickwork on the Back of the Mid Bay
11:27 GSE Tanks 3, 5, & 6
12:22 Equipment Moved for the Orbital Launch Table
13:13 Super Heavy Thrust Dome
13:38 Hardware on the Launch Table
14:05 Barrel Section with Tile Attachment Points Lifted into the Wind Break
14:41 Nosecone with Tile Base Layers in Tent 3
15:14 Delivery!
16:01 Raptor Vacuum Mount Unloaded
16:52 Methane Transfer Tube Unloaded
17:24 Thrust Puck Unloaded
17:54 Barrel Section Moved into the High Bay

*Correction to Label in the Video